Case study
Optimizing a large-scale order system — Bell
Performance improvements, stabilized RabbitMQ/Event Hubs eventing, and CI/CD industrialization to speed up delivery.
For Bell, we helped improve a high-volume internal order management system. The mandate focused on reducing processing time, de-risking releases, and stabilizing event-driven exchanges while maintaining high availability and smooth adoption for teams.

Challenge
Slow processing, post-deployment defects, and complex event-driven integrations made changes risky. SQL and application releases required too much manual effort and lacked repeatability across environments.
Solution
We optimized backend services and strengthened the delivery pipeline to speed up release cycles and reduce regressions. Focus areas included RabbitMQ/Event Hubs stability, code quality, and CI/CD automation.
Outcome
Cut processing time (~35%), reduced post-deploy defects (~30%), and stabilized RabbitMQ/Event Hubs exchanges. Releases became more predictable thanks to CI/CD automation and stronger quality practices.
Inspired by these results?
Let’s map the next milestone for your team with the same delivery focus.
